Alberta, September 2025: NUHN Lagoon Crawler Gets Tuned for Manure Season

ECU reprogramming for tough pumping conditions

Date: September 2025

Location: Alberta, Canada

NUHN Lagoon Crawler after ECU optimization in Alberta — ready for fall manure application

It may look like something from a sci-fi movie, but this machine is all business. The NUHN Lagoon Crawler is built for the dirtiest jobs — pumping out manure lagoons and moving slurry during application season. With September just around the corner, this unit needed maximum efficiency and torque to handle heavy pumping under pressure.

✅ What we did:

  • Adjusted injection maps for smoother RPM under load
  • Improved low-end throttle control and engine torque
  • Performed safe ECU diagnostics and backup
  • Delivered a software-only, 100% reversible calibration

The result? Higher performance in harsh lagoon conditions with lower fuel consumption. With this upgrade, the NUHN unit is now more capable than ever — right when it matters most.